The project is in Sanita’s compound, Halat. The project consists of creating a space next to an existing warehouse structure in order to build a New. The soil consists of Sandy Clay material with gravel inclusions. The challenge in this project is to complete the drilling, micropiles / anchors installation, concreting, excavation & tensioning in a tight & delicate environment, and within a very tight schedule, while the old warehouse remains operational with heavy loads and traffic of loading trucks. The Design/Build solution consists of installing Micropiles vertically covered by a permanent shotcrete wall 25 cm thick. The wall will be temporary supported by one. The row of active anchors spaced 3m to 4m & tensioned 40T . One row of permanent nails will be installed to optimize the wall thickness.