Client: Setraco
The project consists of a 612m long bridge. It is a deck on piers type bridge with piers on pile groups. The bridge has 16spans,each 36m long. Its location is in the jungle zone of Ammassoma in Nigeria with swamp and deep clay sustratum. Our mission was a full geotechnical (piling) and structural design for the entire bridge excluding the top deck.