ATLANTIC TOWERS – VI BAR BEACH

Jul 2012 till Aug 2012; Full Geotechnical & Structural Design of the Foundation System; Including the Piles , Pile Caps,& Mat.
IGM Nigeria also executed the Piles and Constructed the Foundation Mat. This Foundation system required the installation of 5014liner meters of CFA Piling, 600mm in diameter.
3

4

5

6

7

des1 atl

des2 atl