BERKAYEL TUNNEL

Client: HOMAN

Int’l I.G.M. scope of work was to design & build the shoring system along the cuts where few failures already occurred. The geotechnical works included without being limited to:

  • Permanent Shotcrete nailed wall system along the high cuts.
  • Micropiles and Anchors for temporary retention of cuts surrounding structures to be build like the box culvert underpass.

IMG_5046

IMG_5065

IMG_5066

IMG_5981

SAM_1875