Client: HOMAN
Int’l I.G.M. scope of work was to design & build the shoring system along the cuts where few failures already occurred. The geotechnical works included without being limited to:
- Permanent Shotcrete nailed wall system along the high cuts.
- Micropiles and Anchors for temporary retention of cuts surrounding structures to be build like the box culvert underpass.