HARET SAKHER UNDERPASS

Client: ENTERPRISE EDMOND ACAR

The “Harissa – Bkerki ” road and underpass. Int’l I.G.M. scope of work was to design & build 2 bridges with the shoring system along the new Bkerke – Harissa highway . The geotechnical works included without being limited to:

  • Permanent Shotcrete nailed wall system along the high cuts.
  • Traditional retaining walls
  • Micropiles and Anchors for temporary retention of existing structures

The structural works included without being limited to:

  • Box Culvert bridge at the Haret Sakher intersection
  • Supported Bridge at the Entrance