LAU ROAD POSTED on September 7, 2015 Design / Build Jbeil Shoring Slope Stabilization The Project consists of widening and rehabilitating the main road; about 100m road. These works require excavations on the mountain side with vertical cuts 9 to 12m high, which necessitate to be retained by nailing and shotcrete.