MEDCO GAS STATION

Client: S & L CONTRACTING

The new MEDCO Station in the BCD area was a small yet challenging project. Its narrowness made it impossible to provide room for a shoring system. A vertical wall with micropiles and shotcrete was utilized with active anchors to support the sides. The topsoil layer (about 5m deep) consists of a sandy clay fill material, then the clay becomes interbedded with cemented sand. Water was encountered at 6m below grade.