PALACE OF JUSTICE TRIPOLI

Client: OEC CONTRACTING

The new Palace of Justice in Tripoli was one of the largest projects in the North that year. It was a challenging job because of its fast track. An optimized design with monitoring allowed the geotechnical works to finish ahead of schedule. About 300 piles were installed in 20 days! Only one row of high capacity anchors 16m long was installed in order to maintain equilibrium of this 10m deep excavation.