Client: MAN
The trip alone was challenging. Traveling to Irbil in northern Irak was an adventureous journey: after travelling to Istanbul then flying to Dyar Bakir in the very East of Turkey, the journey ended with a 15 hour car drive through the mountains of Irak after waiting 4 hours at the border! The project consisted of a huge mall with 4 towers 30 story each. The mission was to recommend the most suitable system for shoring the 12m deep excvation sides; in addition, the evaluation to determine whether or not the towers would necessitate deep piles or not.