Client: Mr. Toubia Kmeid
It is a Challenging project in Fakra resort in the Lebanese Mountains at 2000m altitude. Project consists of installing 220 piles, 15 m deep, 0.6m in diameter in a tight period of time. Piles were executed using the Soilmec R10 drill rig equipped with a kelly bar and 60cm rock auger. The project was completed in record time to avoid the harsh winter season.